Robert, Sorry, but I didn't take any pics. I installed the pipe clamps about 2" from each end then evenly spaced across the rest of it. I placed the 1"x2" strips about 1/2" down from the top, under the pipe clamps, then installed the "C" clamps. The "C" clamps I snugged down to hold them in...